My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00427
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0028X
Contractor Name
Avery Lake USBR 1976
Contract Type
Miscellaneous
Water District
0
County
Rio Blanco
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INTRODUCTION AND SUMMARY <br /> <br />resources, including oil shale. Other considerations include municipal <br />water needs, enhancement of stream fisheries and recreation values, water <br />to serve non-Federal irrigable lands in both States, and water for energy <br />development other than the prototype oil shale program. The Upper Colo- <br />rado Resource Study will be conducted according to MOP procedures, with <br />participation by other agencies. It is anticipated that the existing MOP <br />team will be expanded to cover the overall Upper Colorado Resource Study, <br />including the Yellow Jacket Unit. When the study is completed, a feasi- <br />bility report and environmental statement will be prepared which will <br />cover a plan found to be best after due consideration of environmental <br />enhancement as well as econom::!.c development. <br /> <br />- '...., <br /> <br />.. ,,' <br /> <br />"':..'. <br /> <br />3 <br /> <br />. "- ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.