My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153514 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153514 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:54:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153514
Contractor Name
Farmers Water Development Company
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ground level survey work was completed during the last week of <br />April and first week of May 19B7. The work included: <br /> <br />1. Constructing and locating ground targets for the aerial <br />photographic mapping; <br /> <br />2. Locating existing features including sinkholes, springs, <br />flow monitoring weirs and piezometers; and <br /> <br />3. Locating and dimensioning the existing outlet works <br />tunne 1. <br /> <br />The survey data and sketches are included in Appendix F of this <br />report. The locations of the sinkholes, springs, weirs and <br />piezometers are shown on Figure 4. <br /> <br />3.3 <br /> <br />Site Inspection Program <br /> <br />General inspections of the dam and adjacent downstream and <br />upstream foundation areas were conducted on an irregular but <br />frequent basis during the field investigation and emergency repair <br />programs. Deta il ed i nterna 1 i nspecti ons of the out1 et works <br />structures were conducted by SRK representatives during completion <br />of the April 19B7 emergency repa i r program and duri ng speci ally <br />scheduled inspection trips on March g, 1987 and June 11, 19B7. The <br />observations made on March g, 1987 are included in the March 1987 <br />SRK report titled "Emergency Repair Program Design Report, Gurley <br />Reservoir". The observations made during the emergency repair <br />program are included in the May 1987 SRK as-built report. The <br />observati ons made duri ng the June 11, 1987 tri pare i ncl uded in <br />Appendix H of this report. <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.