Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Mr. Nelson Jacobs <br />October 5, 1982 <br />Page two <br /> <br />Detailed Plan of Study (revised March 18, 1982), thereby <br />obviating the need to prepare two separate revisions. Likewise, <br />the proposed schedule would supersede that shown in the POS. <br /> <br />After you review and we finalize these two tasks, I will <br />formally transmit the revised Tasks 12 and 13 to you for <br />concurrence pursuant to paragraph 9 of the contract. At that <br />time, we can also initiate a contract amendment, if needed, to <br />extend the termination date of the contract beyond March 1, 1983 <br />(see paragraph 15). <br /> <br />Sincerely, <br /> <br />~~c~~ <br /> <br />Dl.rector <br /> <br />JWM/gl <br /> <br />Encl: as stated <br /> <br />Tudor Engineering Company hereby accepts and agrees to the <br />change in Exhibit B, at page 2 under "Conduct of the Study," <br />increasing the maximum number of preliminary alternatives to be <br />developed in phase I of the study from six to eight. <br /> <br />Tudor Engineering Company <br /> <br />~N~ <br />~~J~~~ ,. ~p~~~~ Robert N. Janopaul <br />pi~fii~/~~~~g~vExecutive Vice President <br /> <br />by <br /> <br />December 1, 1982 <br />Date <br />