My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.--'; <br /> <br />~'J <br /> <br />TASK E4.0 PLAN OF STUDY MEETING <br /> <br />Purnose: Prepare and conduct a plan of study meeting. The objective of this task is to transfer <br /> <br /> <br />information and reach agreement on the Plan of Study (POS) for the proposed expansion of <br /> <br /> <br />the Phase I Study. <br /> <br />Methodolol!V: A two-hour (2 Ius.) meeting will be conducted by Boyle and CWCB personnel to discuss the <br /> <br /> <br />expanded Phase I plan of study. The president and board of directors of each of the ditch <br /> <br /> <br />companies (Gurley, Cone, and U1ylands systems) and the San Miguel Water Conservancy <br /> <br /> <br />District (SMWCD) and other interested parties will be invited to attend, The CWCB will <br /> <br /> <br />contact local participants and arrange for the use of suitable facilities, <br /> <br />The following work items are included in the: plan of study workshop task: <br /> <br />E4.1 Meetinl! Preoaration ' Boyle, in consultation with the CWCB. will review, assemble and <br />prepare pertinent information and material, for presentation at the workshop, Presentation <br />materials will include working maps, and overhead transparencies of key items of the plan of <br />study. <br /> <br />E4.2 Conduct Meetinl! . Boyle and CWCB personnel will conduct a two-hour (2 hrs,) meeting in <br /> <br /> <br />Norwood, Colorado covering the topic of the proposed extension of the Phase I plan of study, <br /> <br />E4.3 Meetinl! Memorandum, Boyle will prepare a brief memorandum to the CWCB summarizing <br />the discussions at the meeting, The memorandum will be a concise summary of the main <br /> <br /> <br />topics addressed during the plan of study meeting. One meeting (4 hrs,) between Boyle and <br /> <br /> <br />the CWCB will b: held to discuss the memorandum. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.