My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />ENCLOSURE B <br /> <br />. <br /> <br />PLAN OF STUDY <br />SAN MIGUEL PROJECT WATER SUPPLY STUDY <br />November 15, 1989 <br /> <br />INTRODUCTION <br /> <br />The following plan of study outlines additional work to be conducted by Boyle Engineering <br />Corporation (Boyle) for the San Miguel Water Supply Study, This work is being performed to <br />provide supplementary analyses and information necessary to make decisions regarding <br />potential improvements to the operations of the participating ditch companies, <br /> <br />Boyle will perform field evaluations, conduct analyses, and prepare reports, The Colorado <br />Water Conservation Board (CWCB) is responsible for overall study management and <br />coordination, The participation and assistance of the Soil Conservation Service (SCS) and <br />Cooperative Extension Service (Extension) in data collection and other technical and <br />coordination roles will be formally solicited as outlined herein, <br /> <br />The plan of study for the Norwood-Redvale Service Area is organized as follows: <br /> <br />Demand Forecasting Plan <br />Demand-Based Operating Plan <br />Water Marketing Mechanism <br />Monitoring Operations <br />Meetings and Workshops <br />Summary and Supplemental Reports <br /> <br />The demand,based operating plans to be developed as part of this work effort are in19nded to .J <br />serve as guidelines for operations, The monthly time step to be used in performing operational <br />simulations will not be sufficiently specific to direct day to day decisions; nor will the ditch <br />companies be bound to follow any suggestions made regarding operations of their systems. <br /> <br />ENCLOSURE B <br />
The URL can be used to link to this page
Your browser does not support the video tag.