My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o! <br /> <br />INTRODUCI10N <br /> <br />..'" <br />~'}- <br /> <br />~) <br /> <br />The following revised plan of study outlines additional work to be conducted by Boyle Engineering Corporation <br /> <br />ATTACHMENT C <br />PLAN OF STUDY <br /> <br />SAN MIGUEL PROJECf FEASIBILfIY STUDY <br /> <br />June 29, 1988 <br /> <br />(Boyle) for Phase I of the San Miguel Project Feasibility Study. This additional Phase I work is being <br /> <br />performed in response to questions and concerns raised during discussions with study area participants. <br /> <br />Boyle will conduct analyses and prepare reports, Overall study management and coordination are the <br /> <br />respoUSlbility of the Colorado Water Conservation Board (CWCB). The results of the work outlined in this <br /> <br />revised plan of study will be reviewed with study area participants prior to a decision on Phase II of the study, <br /> <br />Eighteen Tasks are included in this plan of study. as listed below: <br /> <br />Section <br /> <br />TASKE1.0 <br />TASK E2.0 <br />TASK E3,O <br />TASKE4,O <br />TASK ES,O <br />TASK E6.0 <br />TASK E7.0 <br />TASK EB,O <br />TASK E9.0 <br />TASK EI0,O <br />TASK Ell.O <br />TASK E12,O <br />TASK E13,O <br /> <br />FLOW MEASUREMENT PROGRAM <br />OPERATING RECORDS <br />DATA MEMORANDUM <br />PIAN OF STUDY MEETING <br />ALTERNATIVE RESERVOIR SITES <br />HYDROLOGY WORKSHOP <br />DEFINITION OF ALTERNATIVES <br />HYDROLOGY /WATER RIGHTS <br />WATER DEMANDS <br />HOURLY STREAMFLOW RECORDS <br />SAN MIGUEL CANYON HYDROPOWER PROJECf <br />TECHNICAL EVALUATION OF ALTERNATIVES <br />FINANCIAL EVALUATION OF ALTERNATIVES <br /> <br />1 <br />ATTACHMENT C <br /> <br />~ <br /> <br />3 <br />7 <br />9 <br />10 <br />12 <br />13 <br />15 <br />19 <br />21 <br />23 <br />25 <br />29 <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.