Laserfiche WebLink
<br />. <br /> <br />,,) <br /> <br />. <br /> <br />DOCUMENT B <br /> <br />PLAN OF STUDY <br />SAN MIGUEL PROJECT WATER SUPPLY STUDY <br />August 7, 1989 ~~~- <br /> <br />AUG 0 7 '8';0 <br /> <br />INTRODUCTION <br /> <br />00\.0RADv to{, '!'! ' <br />~VATlr,.- <br />, ~ <br />SOlll:"" <br /> <br />The following plan of study outlines additional work to be conducted by Boyle Engineering <br />Corporation (Boyle) for the San Miguel Water Supply Study. This work is being performed to <br />provide supplementary information necessary to make decisions regarding the direction and <br />level of improvements to be made to the operations and facilities of the participating ditch <br />companies. <br /> <br />Boyle will perform field evaluations, conduct analyses, and prepare reports, The Colorado <br />Water Conservation Board (CWCB) is responsible for overall study management and <br />coordination. The participation and assistance of the Bureau of Reclamation (BOR), the Soil <br />Conservation Service (SCS) , and the Cooperative Extension Service (Extension) in data <br />collection activities and other technical and coordination roles will be formally solicited as <br />outlined herein, <br /> <br />The plan of study is organized as follows: <br /> <br />Norwood-Redvale Service Area <br /> <br />Land,Shares Distribution <br />Soils Data <br />Cropping Pattern <br />On. Farm Irrigation Practices Inventory <br />Distribution Facilities Inspection <br />Streamgage Installation and Data Collection <br />Geotechnical Investigations at Lone Cone Reservoir <br />Meetings <br />Data Collection Report <br /> <br />lilylands Canal arid Reservoir Company <br /> <br />Review Hydrology <br />Geotechnical Investigations at lilylands Reservoir <br />Site Survey lilylands Reservoir and Route Survey lilylands Intake <br />'ntake Canal Sizing <br />Operation Studies <br />Cost Estimates <br />Evaluate Alternative <br />Meetings <br />Summary Report <br /> <br />DOCUMENT B <br /> <br />1 <br />