Laserfiche WebLink
<br />..-uom <>-"....-u"" IK J/IIJ) <br /> <br />ENCLOSURE A <br /> <br />AMENDMENT #3 <br />FEASIBILITY STUDY <br />CONTRACT <br /> <br />m:PAR";'"I,{ENT OR AGENCY :'IlU.I,{BI::R <br />34-04-00 <br />CON', ..ACT ROUTING NUMBER <br />C/O <br />$89,919 A-c--ge [8M <br /> <br />NOPB <br /> <br />THlS CONTRACT. made IhiS~ay of 11.1' 1 ('\ I J../\ k- 198 ~. by and bet~een the <br />Stale of Colorado for the use and benefit of tRe Dep=-esod.rces <br />(Water Conservation Board) . <br />hereinaCter referred [0 as the Stale. and'2 Boy le Enqineerinq Corporation, <br />165 Un~on Blvd" Su~te 200, Lakewood, CO 80228, <br />hereinaCter refe~,ed to as the contractor, IContractor. <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />avaihlble nr,td a sufficient unencumbered balance thereof remains available for payment in Fund Number 4008 . <br />G/L Account Number 5264X, Contracl Encumbrance NumberC1534 72 : and <br />ABL Account No. 12640, Org. Unit 77-77-777, <br />WHEREAS. re4uired approv:.ll. clearance and coordinatiun has been accomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS. a contract was entered into on September 15, 1986. <br />between the State and the Contractor (hereinafter the 110riginal <br />contractll) for the San Miguel Project Feasibility Study; and <br /> <br />WHEREAS, a contract amendment was subsequently entered into <br />on April 25, 1988. between the State and the Contractor <br />(hereinafter the ~amended contract"); and <br /> <br />WHEREAS. the amended contract increased the fee for Phase I <br />of the study and also extended the date of completion; and <br /> <br />WHEREAS. the amended contract was further amended pursuant <br />to paragraph 12. of the Original Contract by a May 13, 1988. <br />letter of agreement between the State and the Contractor <br />(Attachment A). which letter of agreement was completely <br />superseded by the second contract amendment; and <br /> <br />WHEREAS. the Original Contract was amended for the second <br />time on July 18, 1988. to extend the scope of the study and <br />change the time of completion"and the Contractor1s remuneration <br />for conducting additional analyses; and <br /> <br />WHEREAS, it is now necessary to amend the contract again <br />because additional information and analyses have been requested <br />by the local study participants; and <br /> <br />WHEREAS. it is agreed by the State that such additional <br />information and analyses are necessary; and <br /> <br />~, <br /> <br />WHEREAS, because of the additional information and analyses <br />it is necessary to' change -the Contractor I s remuneration and <br />extend the time for completion of the analyses as described in <br />the new plan of study dated August 7, 1989. <br /> <br />NOW, THEREFORE, ~t is hereby agreed that: <br /> <br />1. This Contract Amendment #3 is supplemental to the <br />original contract {Appendix A}, to the first contract <br />amendment (Attachment B). and to the second contract <br />amendment (Document A). which are by this reference <br />incorporated and made a part hereof. All terms. <br />conditions. and provisions of the original contract. as <br />amended by the first and second amendments, unless <br />specifically amended herein. shall remain in full force <br />and effect. <br /> <br />2. The twice amended contract shall be further amended as <br />follows: <br /> <br />a. The first sentence of paragraph 3. is amended to <br />read: <br /> <br />395-53-01-1014 <br /> <br />Page I of --L pages <br />ENCLOSURE A <br /> <br />0578E.... <br /> <br />....... <br />