My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />'~""''''''.~.. ',"" "....' <br />. ' ::t . ,,","') <br />------.. ^-" <br /><i ' <br />STATE OF COLORADO <br />- <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone' (303) 866,3441 <br /> <br />December 12. 1989 <br /> <br />Roy Romer <br />Governor <br />I. William McDonald <br />Director <br />David W. Walker <br />Deputy Director <br /> <br />Boyle Engineering Corporation <br />Attn: Daniel W. Boyd. P.E. <br />165 South Union Blvd.. Suite 200 <br />Lakewood. CO 80228 <br /> <br />Re: Contract No. C-153472 <br />Feasibility Study <br />Amendment #4 <br /> <br />Gentlemen: <br /> <br />Enclosed are four copies of a proposed contract amendment <br />between the Boyle Engineering Corporation and this board for <br />the purposes of expanding the Plan of Study for the San Miguel <br />Project Feasibility Study. amending the time of completion of <br />the study. and increasing the renumeration therefor. as set <br />forth in the contract amendment. <br /> <br />If you find this amendment acceptable. please execute and <br />return all four copies to us as soon as possible. Please note <br />that the signature of the person signing for the Contractor <br />must be attested on all four copies by the individual within <br />your organization who has that authority. <br /> <br />After execution by the proper state officials. one fully <br />signed contract will be returned to you. This process usually <br />takes from four to six weeks. <br /> <br />Very truly yours, <br /> <br />IV, C-, <br /> <br /> <br />N, C, loa nides, P,E.. Ch'ef <br />Project Planning and <br />Construction Section <br /> <br />NCI/gl <br />Enclosures <br /> <br />1419E*-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.