<br />NOPB <br /> <br />*- 90}1{73 <br /> <br />DEPARTMENT OR AGENCY NUMBER <br />34-04-00 <br /> <br />AHENmlENT #4 <br />FEASIBILITY STUDY $ 76,756,00 <br />CONTRACT 612,847,75 <br /> <br />THIS CONTRACT. made this ().:r day of j)~ 198.1. by and between the <br />Stale of Colorado for IRe Ust and benefit of the" Department of'1 Natural Resources <br />(Colorado Water Conservation Board) , <br />hereinafter rrferred 10 as the Stale, :md '2 Boyle Enqineerinq Corporation, <br />165 Union Blvd" Suite 200, Lakewood, CO 8022A, <br /> <br /> <br />Additional <br />Total <br /> <br />hereinaher referred to as the COnlr3ctor./ContractoI'. <br /> <br />WHEREAS. authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />availllble and a sufficient unencumbered balance thereof remains available f()r payment in Fund Number 400 R <br />G/l Account Number ::;? h.d X. (ontract Encumbrance Number r 1 ::; '1 A. 7 2: and <br />ABL Account No. 12640, Org, Unit 77-77-777, <br />WHEREAS. required a['lrro~..nce ..nd coordination has been ilccomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS. a contract was entered into on September 15. 1986. <br />between the Stete and the Contractor (hereinafter the "Original <br />Contractll) for the San Miguel Project Feasibility Study: and <br /> <br />WHEREAS. a contract amendment was SUbsequently entered into <br />on April 25, 1988, between the State and the Contractor <br />(hereinafter the ~amended contract"); and <br /> <br />WHEREAS. the amended contract increased the fee for Phase I <br />of the study ahd also extended the date of completion: and <br /> <br />WHEREAS. the amended contract was further amended pursuant <br />to paragraph 12, of the Original Contract by a May 13, 1988, <br />letter of agreement between the State and the Contractor <br />(Attachment A). which letter of agreement was completely <br />superseded by the second contract amendment; and <br /> <br />WHEREAS. the Original Contract was amended for the second <br />time on July 18, 1988, to extend the scope of the study and to <br />change the time of completion and the Contractor's remuneration <br />for conducting additional" analyses; and <br /> <br />WHER~AS. the Original Contract was amended for the third <br />time on August 15. 1989, to further extend the scope of the <br />study and to increase the time of completion and the <br />Contractor's remuneration for conducting the additional work; <br />and <br /> <br />WHEREAS. it is now necessary to amend the contract again to <br />further analyze and evaluate information for the project; and <br /> <br />WHEREAS, it is agreed by the State that such further <br />analysis and evaluation are necessary; and <br /> <br />WHEREAS. b~cause of the further analysis and evaluation. it <br />is necessary to increase the Contractor's remuneration and to <br />extend the tim~ for completion of the work as described in the <br />new Plan of StUdy dated November 15. 1989, <br /> <br />NOW THEREFORE, it is agreed that: <br /> <br />1. Consid~ration for this amendment to the Original <br />Contract. Conttact Encumbrance Number Cl53472. Contract Routing <br />Number 87096, 4ated September 15, 1986. consists of the <br />payments which shall be made pursuant to this amendment and the <br />promises and agreements herein set forth. <br /> <br />2. This Contract Amendment #4 is supplemental to the <br />Original Contract (Appendix A). to the first Contract Amendment <br />(Attachment B). to the second Contract Amendment (Document A). <br />and to the thitd Contract Amendment (Enclosure A), which are by <br />this reference incorporated and made a part of hereof. All <br /> <br />395-5J01-1014 <br /> <br />Page I of i pages <br /> <br />1419E~ <br />