My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153771 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153771 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
10/5/2006 11:54:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153771
Contractor Name
Horse Creek Water Users Association
Contract Type
Loan
Water District
17
County
Crowley
Bill Number
HCL
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />REFERENCES <br /> <br />Lytle. Bruce A.. 1996. Evaluation of Horse Creek Water 'Users Association Well Pumping <br />on Downstream Water Rights: John C. Halepaska & Associates. Inc. <br /> <br />1989, Horse Creek Basin Study: Office of the State Engineer, Division of <br />Water Resources <br /> <br />1990. Horse Creek Basin Study Phase 1: Office of the State Engineer, Division <br />of Water Resources <br /> <br />Thompson. Gary 8.,1992. Water Supply Availability at Box Springs Canal: W. W. <br />Wheeler and Associates, Inc. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.