My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00422
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2011 10:10:00 AM
Creation date
10/5/2006 11:54:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153391
Contractor Name
Beeman Irrigation and Milling Company and Meadow Island Ditch Company No. 2
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 82-87
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STRUCTURE PLANS <br />It is proposed to use 4,000 psi air entrained concrete and 60,000 psi <br />strength reinforcing steel in the structure. About 225 cubic yards of <br />concrete will be required. The foundation cutoff wall will require about <br />BOOOsquare feet of Type PZ38 or PZ32 steel sheet pile. All designs conform <br />to applicable codes including those of the ACI, AISC and CRSI. The dam <br />5tructure.will be 147 feet wide and 27 feet long. A 25 foot long wing wall <br />is located on the east upstream corner. The side walls are one (1) foot <br />thick and approximately 10 feet tall. A 15 foot sheet pile cutoff wall forms <br />the foundation at both the upstream and downstream ends of the dam's floor. <br />This sheetpile cutoff wall provides stability for the structure and will <br />assure that no piping flow will occur in the foundation material. The sheet- <br />pile also wraps around the nose of the island that separates the main river <br />channel from the smaller side channel. The floor of the diversion dam will <br />be one (1) foot thick and will have provisions for anchoring the flash board <br />supports. The floor also has weep holes to prevent hydrostatic uplift pressures <br />from building underneath it. All concrete is reinforced with double mats of <br />Grade 60 reinforcing steel. <br />RIGHT-OF-WAY <br />No new right of way will be required. Arrangements have already been <br />made with adjacent landowners for an access road to the site. <br /> <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.