My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153606 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153606 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:26 AM
Creation date
10/5/2006 11:54:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153606
Contractor Name
Terrace Irrigation Company, The
Contract Type
Loan
Water District
21
County
Conejos
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br /> <br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br /> <br />CONSTRUCTION FUND PROGHAM PIlOCEDUHES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and"proJect sponsor,' <br /> <br />2. Preparation of detailed plans and specificatlol16 [or <br />authorized projects by consulting engineering Cirrn. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff {plans and specifications (or storage dams and <br />reservoirs must also be approved by State Engineer'S <br />office) , <br /> <br />4, Board staff approval of bidding for the project, Board <br />staff present at bid opening [or construction. <br /> <br />S. Project sponsor may iSGue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued), <br /> <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br /> <br />7, Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The conSUlting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and filing. <br /> <br />EXHIBIT D <br /> <br />1588E <br />
The URL can be used to link to this page
Your browser does not support the video tag.