My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153707 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153707 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
10/5/2006 11:54:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153707
Contractor Name
Rainbow Park Water Company
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Institutional Considerations <br /> <br />The RPWC has approval from the CWCB and the Legislature to borrow $130,000. (See <br />Appendix D). The RPWC has obtained an approving vote of the shareholders to contract for <br />the loan, and the loan contract between the CWCB and the RPWC has been completed. A <br />memorandum of the RPWC shareholder meeting is included in Appendix G. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. There are no significant <br />roadblocks which would keep the RPWC from successfully completing this project. <br /> <br />Feasibility of the Rehabilitation <br />of the Rainbow Park Ditch. <br />March 15, 1996 <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.