My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00413
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:46:32 AM
Creation date
10/5/2006 11:54:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153400
Contractor Name
Larkspur, Town of
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
SB 79-537
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'/ <br /> <br />'. <br />. <br /> <br />~ <br />!) <br /> <br />:" <br />.' } <br /> <br />SCHEDULE A <br /> <br />CO LOll ADO WATEIl CONSEIlVATIOI~ UOAllO <br />CONSTRUCTION FUND PROGRAM PRDCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor'. <br /> <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications For storage dams anel <br />reservoIrs must also be approved by State Engineer's <br />office) . <br /> <br />4, <br /> <br />Board staff approval of bidding for the project. <br />staff present at bid opening for construction. <br /> <br />Board <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6, <br /> <br />Approval of <br /> <br />Conduct a pre-construction conference. <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspectIon and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-blJllt drawinns to Aoard staff for <br />.:JppL'UVd.l. <Jilt! rjlIll~. <br /> <br />n1sl< No, 102 <br />cwcb/con/fun (scllcd/a) <br />
The URL can be used to link to this page
Your browser does not support the video tag.