Laserfiche WebLink
<br />Form 6.AC.a2A fR ~/8~1 <br />NO rRP B <br /> <br />E""'- '~5L;;QQS <br />/)1-.1.". .RTM.., r OR A(;ENn' NUMlJl'.K <br />34-04-00 <br />CONI RAU' ROllrlN(i NtJMIIHt <br />.1;)o~' <br />_ii___~L.......___ <br />$125,000 <br /> <br />PROJECT <br />CONTRACT <br /> <br />nus CONTRACT, made Ihis b-fA. day O{-AI.I~<SI ..__198 r:. by and bclwel'nlhe <br />Slale of Colorado for Iht' use and bellefit o{ the I)eparlmt'lIt O{'1 Natura 1 Resturces <br />(Colorado Water Conservation Board), ._~--- <br />hereinafter rr{erred 10 as the Slale, and'2 Beaver Park Wa ter, ii1"C:-:- .~__ <br />Box 286, penrose, CO 81240, .-----=~.______~ <br />hereinafter referred 10 as the contractor/Contractor, <br /> <br />WHEREAS, authority e"i.\js in lhe Llw and Funds ha...e heen hudgt'led, appropriated and otherwise made <br />.....ailahlc :md a su{{jcjenl unencumhered IHlI:lllce Ihereof remains ~ilahle for paymt'1l1 in Fund Number j 008 _, <br />G/l Al"l"uunl Numher 5365X, (unlral't E.lcumbr,!nce Number J'1:-=1tv/: ;lnd <br />ABL Account Number 13650, Org, Unit 77-77-777, <br />WUEREAS, retluin'd appro"':11. ~e amll'OIlf(linaliun h:a heell n('con~plishrd from "lid with appruprialc <br />agellcies: and <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119. Colorado <br />Revised Statutes, the State is authorized to loan money for the <br />construction of water projects for the benefit of the people of <br />the State; and <br /> <br />WHEHEAS, tIle Contractor is a mutual ditch company in the <br />State of Colorado and wishes to repair. or cause to be <br />repaired, its irrigation system. hereinafter called the <br />project, for the Beaver Park Water, Inc., fihareholders in <br />Freemont County, Colorado, at an estimated cost of Two HundLed <br />Fifty Thousand Dollars ($250,000); and <br /> <br />WHEREAS, a feasibility investigation oC said project was <br />conducted and it was forind that such a project is technically <br />and financially feasible; and . <br /> <br />WHEREAS, the State has now agreed to loan money for the <br />construction of said project upon mutually agreeaule ter.ms and <br />conditions. subject to the availability of funding for that <br />purpose; and <br /> <br />WHEREAS, pursuant to Senate Bill No, 15. Fifty..Sixth <br />General Assembly of the State of Colorado. duly enacted into <br />law. the Colorado Water Conservation Board has been authorized <br />to loan a sum not to exceed One Hundred Twenty-}o'i Ve Thousand <br />Dollars ($125.000) for construction of the project; <br /> <br />NOW. THERE~ORE. in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A, The Contractor agrees that it .shall: <br /> <br />I, Employ an engineering firm to prepare project plans and <br />specifications for the project, Botll the enginBecing firm and <br />the project plans alld specifications must be approved by tile <br />State bofore illitiation of constructioll on the project, <br />including any real estate and water rights acquisitions. can <br />commence. <br /> <br />2. Contract for the construction of said project to a <br />responsible and capabl;e firm or firms (hereinafter reforred to <br />as Construction f'irm or Firms). which Construction 1"inns shall. <br />when required by the State. be selected through competitive <br />pUblic bidding, said project to be completed within two (2) <br />years of the date of this contract in accordance with the <br />project plans and specificatiolls and any necessary modification <br />thereof approved by the State. The State must approve. in <br />writing. all contracts before they can become effective, "he <br />above-specified time may be extended by the State if such Lime <br />is insufficient because of acts of God or other acts or <br />circumstances beyond the control of the Contractor. <br /> <br />J9.5-5){)"F'0'I4 <br /> <br />ragel()f~pagcs <br />.(Sl'C in.\lflU"li"n~ nn Icv~r~ "f ta'll'ag~.1 <br /> <br />1l90E <br />