Laserfiche WebLink
<br />C150000;> <br /> <br />TOW)\; OF PALISADE - corrOI'WOODPIPELI)\;E P/{O,JECT <br /> <br /> <br />Conlr.lctor Installing Pipe <br />Along Access Road <br /> <br />AcC('ss Road <br />Arter I~pe Installation <br /> <br />Proiect Dl'Scriptinn <br /> <br />This $915.000 construction project was the replacement 22.000 linear feet of the Town of <br />Palisade's existing raw water delivery pipeline. The replacement pipe consisted of a 14-inch <br />diameter ductile iron walennain originating from the outlet pipe on Cabin Reservoir to a point on <br />the existing system 5.300 fecI upstream of the Town's water treatment plant. The new 4.2 miles of <br />raw water delivery pipe wa.. installed along the access road that runs through the narTOW rocky <br />canyon of Cottonwood Creek to Cabin Reservoir. Del-Mont Consultants. Inc. of Montrose. Co. . <br />designed the project and Western Slope Utilities. Inc. out of Breckenridge. Colorado. conslructed <br />the improvements. <br /> <br />I'roiect Data <br /> <br />Sponsor: Town of Palisade <br /> <br />Count~.: :-"lesa <br /> <br />Water Source: Cottonwood Creek <br /> <br />Terms of Loan: 5729.521 @ .HXl% for 30-years Suhstantial Completion Date: Oct 1. 2000 <br /> <br />Design Enginft'r: Del-Mont Consultants - Montrose. Colorado <br /> <br />Construction Contrdctor: Western Slope Utilities - Breckenridge. Colorado <br /> <br />Design Criteria: Max. Flow RUle::; 6 mgpd <br />Cla'\s 52 - 14-inch DIP <br /> <br />Max. Working Pressure::; 350 Ibs. <br />Avg. Working Pressure::; 30 psi <br /> <br />Annual Volume of 'Vater Delh;ercd b~' the Project: 360 million gallons <br />