My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br /> <br />-; <br /> <br />,-- <br /> <br />- <br />I <br />, <br />, <br /> <br />that the Study has covered only a limited number of the facets involved in selection of projects for <br />construction, no ranking or preference has been attempted. Instead, alternatives have been defined <br />and water yields and estimated costs have been listed for consideration in the next level of <br />development of these projects. <br /> <br />HYDROLOGIC ANALYSIS <br /> <br />The portion of the Upper Colorado River Basin analyzed in this Study extends over 200 miles <br />from the Continental Divide to the Cameo stream gage upstream of Palisade, Colorado, The farthest <br />downstream dam and reservoir site studied was the Una Site, between Parachute and DeBeque, <br />some 35 miles east of Grand Junction. <br /> <br />In the upper reaches of the study area, the Blue River and Muddy Creek flow into the <br />Colorado River near Kremmling, Colorado. Four dam sites are located in this vicinity. Alternative <br />. <br /> <br />Wolford Mountain Sites A' and C are located to the north on Muddy Creek. The Red Mountain Site is <br />1 mile east of Kremmling on the Colorado River, and the Azure Site is 10 miles downstream to the <br />southwest of Kremmling on the Colorado River in Lower Gore Canyon. <br /> <br />To the south of Kremmling, the existing Green Mountain Reservoir regulates the Blue River <br />to allow for out-of-priority diversions by the Colorado-Big Thompson Project and to provide water for <br />western Colorado's needs. Further up the Blue River, Dillon Reservoir stores flows which can be <br />diverted through the Roberts Tunnel. West of this area, closer to the confluence of the Eagle and <br />Colorado Rivers is the Wolcott Site. It is located on a minor tributary to the Eagle River just north of <br />the town of Wolcott. It is an off-stream storage site that would be filled with water pumped from the <br />Eagle River, and, alternatively could also receive flows pumped from the Colorado River. <br /> <br />Hydrologic conditions prevailing in the Upper Colorado River Basin were evaluated to <br />estimate the yield from each reservoir site and to assess the ability of the proposed reservoirs to <br />meet the objectives of a Joint-Use Reservoir or to function as Replacement Reservoirs for the Green <br />Mountain Exchange Project. These hydrologic analyses included estimation of historic and natural <br />streamflows in conjunction with evaluating historic water use. Water rights and other legal and <br />institutional arrangements were examined that could affect river administration in the basin. In <br />addition, various levels of water development in the basin were examined to estimate potential <br />future water utilization. To effectively perform such hydrologic analyses, a review was made of <br />several existing hydrologic simulation models for their potential applications. The Boyle <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.