My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-------..-..-.--------.-- _...._._-----------_.~_.._--- -_._- --_.~ -----------.--- -_._~--- -"-- -_.- .----------------.--- <br /> <br />3,0 WATER RESOURCES <br /> <br />'""" <br /> <br />""'" <br /> <br />Hydrologic analyses were conducted to estimate the yield from each reservoir site and to <br />estimate the capability of the proposed reservoirs to meet the requirements of a Joint-Use Reservoir <br />or to function as Replacement Reservoirs for the Green Mountain Exchange Project, Legal and <br />operational considerations involved hydrologic characteristics, administration of the Upper Colorado <br />River Basin and projected water resources utilization. Specific hydrologic analyses were made of <br />the following: <br /> <br />o <br /> <br />A water rights analysis provided estimates of flows that are legally available for <br />storage at the six proposed sites based on the monthly flows for the 1951 to 1983 <br />hydrologic study period, The analysis was performed for existing conditions and <br />moderate and high levels of future development of conditional water rights (see <br />Section 3,3). <br /> <br />,'-' <br /> <br />, <br />, , <br /> <br />o <br /> <br />Reservoir operation analyses were performed to estimate the firm annual yield of <br />each reservoir site, In consultation with the Authority, the firm annual yield was <br />defined as the volume of water that can be provided every year without any shortage, <br /> <br />o <br /> <br />The Green Mountain Reservoir was analyzed in detail to estimate its yield based on <br />the requirements of Senate Document No, 80, existing USBR operating policies and <br />existing Colorado River administration. <br /> <br />o Operational analysis of the Upper Colorado River Basin with projected future water <br />demands provided an estimate of the increased yield of Dillon Reservoir due to <br />pumpback operation and provided estimates of the yields of single reservoirs and <br />combinations of reservoirs serving as Replacement Reservoirs for Green Mountain <br />Reservoir, <br /> <br />.- <br /> <br />- <br /> <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.