My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />I <br />I <br />1 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br /> <br />;' <br /> <br />/ <br /> <br />@ <br /> <br />SOllie EnQineerinQ Corporation <br /> <br />Suite 200 <br />165 South Union <br />Lakewood, Colorado 80228 <br /> <br />consultlnQ enQlneers <br /> <br />303/987-3443 <br /> <br />Mr. UIi Kappus, P.E., Executive Director April 27, 1987 <br />Colorado Water Resources and Power Development Authority <br />1580 Logan Street, Suite 620 <br />Denver, Colorado 80203 <br /> <br />'Final Report for the Joint-Use Reservoir and Green Mountain Exchange Projects <br /> <br />Dear Mr. Kappus: <br /> <br />We are pleased to submit this Final Report, as required by our contract dated June 7, 1985. A <br />Summary Report is submitted under separate cover. These reports provide information and data on <br />reconnaissance-level engineering and hydrology for two conceptual projects: the Joint-Use Reservoir <br />Project and the Green Mountain Exchange Project. Preliminary hydrologic, geotechnical, engineering <br />design and cost studies have been carried out to define project alternatives based on an <br />approximately uniform level of investigation. The Study has progressed in the following sequence, <br />each concluded with a task memorandum report: <br /> <br />o Initial screening and pre-reconnaissance investigation <br />o Hydrologic, water rights and operational analysis <br />o Reconnaissance-level project designs and cost estimates <br />o Comparative analysis and cost-yield relationships of alternative reservoirs and <br />alternative combinations of water-exchange reservoirs and conveyance system. <br /> <br />Alternative projects have been defined along with water yields and estimated costs. This will provide <br />consistent, comparative, technical and cost data to serve as a basis to evaluate these alternatives for <br />possible future implementation. <br /> <br />It should be noted that no assessment has been included in the Study of the December, 1986 <br />agreement between the Northern Colorado Water Conservancy District and its Municipal Subdistrict, <br />the Colorado River Water Conservation District and the Denver Board of Water Commissioners nor the <br />possible change in operation of the Shoshone Power Plant. <br /> <br />As you are aware, ail of the work on this Study has been executed in Colorado. Thomas S. Maddock, <br />the Principal-in-Charge of this contract for Boyle Engineering Corporation; Dan Boyd, Project Manager; <br />Dale Diamond, Technical Director; Young Yoon, Principal Hydrologist; Chen & Associates, <br />Geotechnical Subconsultant; and the entire Denver office staff; have greatly appreciated this <br />opportunity to contribute to the evaluation of two such important projects within the State of Colorado. <br />We also acknowledge the excellent support and guidance we have received from Dan Law, your <br />Project Manager, and the project sponsors; the Colorado River Water Conservation District, <br />represented by Eric Kuhn; and the Denver Water Board, represented by Bob Fischer; the Exchange <br />Team Advisory Committee; and the Board of Directors of the Authority. We look forward to future <br />opportunities to be of service. <br /> <br />Very Truly Yours, <br />B~LE ENGINEERING CORPORATION <br />JU~J~ <br />Daniel W. Boyd, P.E. <br />Project Manager <br /> <br />DN-C1 0-1 00-12 <br />DWB/cec <br />
The URL can be used to link to this page
Your browser does not support the video tag.