Laserfiche WebLink
<br />--..- <br /> <br />PHASE 1 <br /> <br />01 PROJECT OBJECTIVES <br /> <br />-----"- <br /> <br />02 EXISTING DATA REVIEW <br /> <br /> <br />06 SELECTION FOR RECONNAISSANCE <br /> <br />- -- <br />~, <br /> <br />~ <br /> <br />- <br /> <br />00 MEETINGS & PUBLIC INFORMATION <br /> <br />03 SCRENING FOR ADD'L STUDY <br /> <br /> <br />PHASE 3 <br /> <br />08 GEOTECHNICAL INVESTIGATIONS <br /> <br /> <br />09 PRELIMINARY RESSERVOIR DESIGN <br /> <br /> <br />10 ALTERNATIVE COMPARISON <br /> <br />- <br /> <br />- <br /> <br />- - <br /> <br />PHASE 2 <br /> <br />04 HYDROLOGY & OPERATIONAL ANALYSIS <br /> <br /> <br />06 EXCHANGE HYDROLOGY <br /> <br />07 GREEN MTN TO DILLON CONVEYANCE <br /> <br />11 REVIEWS & FINAL REPORT <br /> <br />COf..OAADO WATER RESOURCES <br />AND POWER DEVELOPMENT AUTHORITY <br />JOINT-USE RESERVOIR & GREEN MOUNTAIN <br />EXCHANGE PROJECTS <br /> <br />STUDY PHASES & TASKS <br /> <br />BOYLE ENGINEERING CORPORATION <br />Con.ultlng Engln..r. <br /> <br />NOVEMBER 1986 <br /> <br />FIGURE 1.2 <br />