Laserfiche WebLink
<br />TABLE OF CONTENTS <br /> <br />EXECUTIVE SUMMARY <br />Table of Contents <br />List of Tables <br />List of Figure <br /> <br />1.0 <br /> <br />INTRODUCTION <br />1.1 BACKGROUND <br />1.2 PROJECT ORGANIZATION <br />1.3 REPORT ORGANIZATION <br /> <br />2.0 <br /> <br />ELEMENTS SELECTED FOR RECONNAISSANCE EVALUATION <br />2.1 RESERVOIR SITE DESCRIPTIONS <br />2.2 CONVEYANCE SYSTEM ALTERNATIVE DESCRIPTION <br />2.3 INITIAL SCREENING <br /> <br />3.0 <br /> <br />WATER RESOURCES <br />3.1 HYDROLOGIC CHARACTERISTICS <br />3.2 ADMINISTRATION OF THE UPPER COLORADO RIVER <br />3.3 WATER RESOURCES UTILIZATION <br /> <br />4.0 <br /> <br />RESERVOIR YIELDS <br />4.1 HYDROLOGIC SIMULATION MODEL <br />4.2 SIMULATION MODEL RULES <br />4.3 MODEL VERIFICATION <br />4.4 GREEN MOUNTAIN RESERVOIR WATER SUPPLY <br />4.5 RESERVOIR YIELDS UNDER ALTERNATIVE CONDITIONS <br /> <br />5.0 <br /> <br />WOLFORD MOUNTAIN SITE A' DAM AND RESERVOIR <br />5.1 SITE TOPOGRAPHY <br />5.2 STUDIES AND FIELD INVESTIGATIONS <br />5.3 GEOLOGICAL DESCRIPTION <br />5.4 DESIGN CONSIDERATIONS <br />5.5 PROPOSED DAM AND SPILLWAY <br />5.6 DAM AND RESERVOIR APPURTENANCES <br />5.7 HIGHWAY RELOCATION <br />5.8 SUMMARY OF ESTIMATED OPERATION AND CONSTRUCTION COSTS <br /> <br />PAGE <br /> <br />1 <br />i <br />iv <br />vi <br /> <br />1-1 <br />1-2 <br />1-3 <br />1-5 <br /> <br />2-1 <br />2-1 <br />2-3 <br />2-4 <br /> <br />3-1 <br />3-2 <br />3-3 <br />3-5 <br /> <br />4-1 <br />4-1 <br />4-3 <br />4-8 <br />4-10 <br />4-14 <br /> <br />5-1 <br />5-1 <br />5-1 <br />5-2 <br />5-3 <br />5-5 <br />5-7 <br />5-8 <br />5-9 <br />