My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00405
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153304
Contractor Name
Beaver Park Water, Inc.
Water District
0
County
Fremont
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I, <br /> <br />, <br /> <br />BOX 11223 <br /> <br />~f:: .-:. ..". -j!'~I~' "~ <br /> <br />ENGINEERlt~f'r ,IV 'IiI' <br /> <br />CONSULTING WATER ENGINEERS Co - --_ _ '", )/'Ijj <br />PUEBLO,COlORADO B1001 303-546-01eoNSER~O. WAr,-,. . <br />Allv., <br />~v..,ttD <br /> <br />APPENDIX B <br /> <br />, <br /> <br />HYDRO <br /> <br />Mr, Nick Ioannides <br />Colorado Water Conservation Board <br />1313 Sherman Street , <br />Denver, Colorado 80203 ' <br /> <br />March 2, 1979 <br /> <br />Dear Nick: <br /> <br />ADDENDUM TO FEASIBILITY STUDY PROPOSAL <br />BEAVER PARK IRRIGATION SYSTEM <br /> <br />The following additional details are added to the proposed <br />work on the major rehabilitation tasks of the previous proposal. <br /> <br />1. Mapping of amount of sediment storage at the diversion dam, <br />Estimate yardage to be removed and cost, Inspection of diversion <br />gate and sluice gate, estimate replacement cost. Estimate cost of <br />concrete repairs, Evaluate the addition of a sand trap in the <br />diversion pipeline, Evaluate air release valves on the pipeline. <br /> <br />2. Survey profile and cross-sections of the Upper Canal. <br />Calculate hydraulic profile at various flows, Calculate flows in <br />each canal segment to size pipeline or ditch lining and estimate <br />construction costs. Locate all lateral gates and estimate the <br />replacement needs and costs, Make ditch loss measurements to <br />determine segment losses. <br /> <br />3. Survey Brush Hollow spillway cross-section, Calculate the <br />hydraulic capacity. Determine the watershed area and peak inflow. <br />Determine the design of an inlet structure from the upper ditch, <br />Estimate construction costs. Inspect outlet tube and gates, <br />Evaluate seepage control around embankments, <br /> <br />4, Survey profile and cross-sections of Lower Canal from Brush <br />Hollow Dam to Third Street. Make ditch loss measurements to <br />determine segment losses. Determine sizing of ditch lining or <br />pipeline and estimate construction costs. Calculate hydraulic <br />profile. <br /> <br />JMD /mmd <br /> <br />Very truly yours, <br /> <br />91- H]),,^-a-<-~ <br /> <br />ohn M DumeyeiJ, PE <br /> <br />cc. Beaver Park Water, Inc. <br /> <br />APPENDIX B <br /> <br />GROUNDWATER. HYDROLOGY. WATER RIGHTS . WATER QUALllY . WATER SUPPLY . SEWER STUDIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.