Laserfiche WebLink
<br />WD REMEDIATION COSTS FOR SILVER SPRINGS TROUT FARM <br />From April 1997 to August 1998 <br /> <br />TYPE <br /> <br />Hydrated Lime <br />PCR Testing <br />Consulting <br /> <br />Feasibility Studies <br /> <br />Raceway Design <br />Raceway Engineering <br />Soil Testing <br />Concrete Testing <br />Raceway Construction <br />Change Orders <br /> <br />Precast Concrete diversion box <br />Blue Print Copies <br />Hatchery & Old Raceway Remodel <br /> <br />New Raceway Screens <br /> <br />Finish Grading <br />Lawyer, contract review <br /> <br />FROM <br /> <br />Alpine Lumber, for soil treatment <br />Pisces Molecular <br />Dr. Tom Baldwin, WADDL <br />Pat Decker, West Water Consulting <br />Dan and Jacque Sherwood, labor*** <br />Trip to Idaho to tour trout farms <br />Trip to World Aquaculture Show <br />Trips to Denver for Fish Health <br />Board meeting, WD regulation <br />Trips for CDOW Wildlife Commission <br />meetings, WD regulations <br />Trips to Internation Whirling Disease <br />Conferences <br />Fish Pro <br />Chimney Rock <br />Lambert & Associates <br />Lambert & Associates <br />MA Concrete <br />#1, increase raceway wall height <br />#2, eleminate 65ft raceway wall <br />#3, 300ft of 18" collection line <br />#4, installation of diversion box <br />#5, Culvert and dry well <br />Grand Junction Pipe & Supply <br />Surrey Instrument <br />By Silver Springs Trout Farm <br />Labor <br />By Silver Springs Trout Farm <br />Labor <br />RK Excavation <br />Williams, Turner & Holmes <br /> <br />*** Dan and Jacque Sherwood, Labor figured at 20 hours per week <br />spent on remediation issues, per person for a period of time from <br />April 1997 to construction completion in August 1998. <br />64 weeks X 40 hours X 30.00 dollars per hour. <br /> <br />COST <br /> <br />538.21 <br />2,868.00 <br />3,675.00 <br />768.22 <br />76,800.00 <br />500.00 <br />1,200.00 <br /> <br />750.00 <br /> <br />500.00 <br /> <br />1,000.00 <br />2,400.00 <br />13,450.00 <br />3,950.00 <br />787.96 <br />208,852.49 <br />4,373.33 <br />(1,077.80) <br />6,810.00 <br />1,734.00 <br />1,220.00 <br />1,368.00 <br />57.15 <br />6,865.37 <br />2,000.00 <br />4,322.74 <br />750.00 <br />2,694.67 <br />1,200.00 <br /> <br />350,357,34 <br />