Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />1''- <br />.' <br /> <br /> <br /> <br />I.. <br />Ie. <br /> <br />I <br /> <br />1- <br /> <br />. <br /> <br /> <br /> <br />-.. Y.',., <br /> <br /> <br />I <br />I <br />I., <br />I <br />I <br /> <br />-) <br /> <br /> <br />JERIS A. DANiElSON <br />State Engineer <br /> <br />~ <br /> <br />RICHARD D. LAMM <br />Governor <br /> <br />OFFICE OF THE STATE ENGINEER <br />DIVISION OF WATER RESOURCES <br /> <br />.' <br /> <br />1313 Sherman Street-Room 818 <br />Denver, Colorado 80203 <br />(303) 866-3581 <br />January 2. 1986 <br /> <br />Mr. B. LeRoy Black <br />UTE Engineering & surveying Company <br />Box 614 <br />443 Dodge <br />Delta. 00 81416 <br /> <br />,'. <br /> <br />',.". <br /> <br />When replying. refer' ~L: <br />LONE CABIN RESERVOIR r- <br />w. Div. 4. DAHID: 400404 <br /> <br />. '.: <br /> <br />'.~ .' <br /> <br />Dear ,Mr. Black: <br /> <br /> <br />.. We completed our review of 'your plans and specifications for the slide <br />',:' repair on Lone Cabin Reservoir' s downstream face . Based on this review and <br />. "',previous inspection reports. the approval of these plans will not remove the <br />restriction which originated 'due to an inadequate spillway. ,Until we approve <br />a hydrology'study. the restriction will still be enforced.. <br /> <br />However. in order to approve the plans and specifications for the slide. <br />the following items need addressing: <br /> <br />".. .:"" <br /> <br />1) . A cost estimate and filing fee is required. <br /> <br />2) Specifications must include: <br /> <br />a) <br /> <br />provision that the plans and specifications may not be materially <br />changed in any particular except with the written consent of the <br />State. Engineer. ' <br /> <br />,b) provision for developing AS-BUILT drawings. <br /> <br />c) provision that construction cannot be considered complete until <br />the State Bngineer has approved the same in writing. <br /> <br />,3) A Geotechnical Report is required on the borrow material. The report. <br />'should follow the guidelines on page 25 of the .Design Review Manual." <br /> <br />4) The type of embankment material described in Section 02219. page 6. / <br />item 2.01.8 and C is vague. Clarify the description. which should be <br />determined in the Geotechnical Report. <br />