My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 0221.0 <br /> <br />3. (>:3 GRADING <br /> <br />A. Gener'al: <br /> <br />1. <br /> <br />Grade areas uniformly within limits of grading under <br />this Section, including adjacent transition areas and <br />borrow ayeas. <br /> <br />~ <br />~. <br /> <br />Smooth finished surfaces to a neat appearance with <br />proper drainage. <br /> <br />3.04 REMOVAL OF UNSUITABLE SOILS <br /> <br />A. During the progress of clearing, borrow excavation and <br />site grading, soils such as peat, soft clay, quicksand or <br />other materials which are unsuitable for embankment <br />construction may be encountered. These materials shall be <br />removed from the site and disposed of by the Contractor. <br />The area shall be backfilled to grade with suitable <br />embankment materials complying with the provisions of <br />Section 02219 - Embankment construction. <br /> <br />3.05 ACCESS ROADS, DETOURS, AND BYPASSES <br /> <br />A. The contractor shall be responsible for providing all <br />access roads required to get materials and equipment to <br />the work areaS. All barricades and safety devices <br />required to protect persons from injury and to avoid <br />property damage shall be determined by the Contractor and <br />furnished by him at his own expense. <br /> <br />3.06 MEASUREMENT AND PAYMENT <br /> <br />A. No separate measurement and payment will be made for site <br />grading. The cost for this work will be included in items <br />bid that require site grading such as embankment <br />construction. <br /> <br />END OF SECTION <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.