Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />FEASIBILITY STUDY FDR REHABILITATION <br />OF <br />BARNES MEADOW DAM AND RESERVOIR <br />LIST OF FIGURES <br /> <br />PAGE <br /> <br />4 <br /> <br />18 <br />19 <br /> <br />40 <br /> <br />44 <br />58 <br />66 <br />76 <br />77 <br /> <br />78 <br /> <br />83 <br /> <br />1. 1 Project Map <br /> <br />IV.l City of Greeley Population Projections 1985-2015 <br />IV.2 City of Greeley Projected Annual Water Usage 1985-2015 <br /> <br />V.l Geotechnical Investigation - Plans and Survey Data <br />V.2 Geotechnical Investigation: Plan, Sections and <br />Survey Data <br />V.3 Stability of Existing Conditions <br />V.4 Rehabilitation Alternatives <br />V.5 Feasibility Design: Location and General Information <br />V.6 Feasibility Design: Embankment and Outlet Conduit, <br />Plan and Sections <br />V.7 Feasibility Design: Overflow Spillway & Dike, Plan and <br />Sections <br />VI.l Project Schedul e and Fund Requi rement Schedul e <br /> <br />VII.l Average Yearly Water Cost <br /> <br />90 <br /> <br />1152c <br />