Laserfiche WebLink
<br />I <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br /> <br />TABLE OF CONTENTS <br />Page 3 <br /> <br />PAGE <br /> <br />5.0 Feasibility Design <br /> <br />73 <br /> <br />73 <br /> <br />73 <br />74 <br /> <br />74 <br />75 <br /> <br />75 <br /> <br />75 <br />79 <br />79 <br />80 <br />81 <br /> <br />81 <br /> <br />82 <br /> <br />82 <br /> <br />82 <br />84 <br />84 <br />84 <br /> <br />86 <br />86 <br /> <br />86 <br />87 <br />88 <br />88 <br /> <br />89 <br /> <br />89 <br />91 <br />92 <br /> <br />5.1 Design Criteria <br /> <br />5.1.1 Embankment Dam Stability Criteria <br />5.1.2 Embankment and Foundation Filter <br />and Drainage Criteria <br />5.1.3 Dutlet Works Design Criteria <br />5.1.4 Spillway Design Criteria <br /> <br />5.2 Feasibility Design Description <br /> <br />5.2.1 Embankment Dam and Foundation <br />5.2.2 Outlet Works <br />5.2.3 Service Spillway <br />5.2.4 Auxiliary Spillway and Dike <br />5.2.5 Chambers Lake Inlet Dike <br /> <br />5.3 Stability Analysis <br /> <br />CHAPTER VI: ESTIMATED COSTS <br /> <br />1.0 Summary of Project Costs <br /> <br />1.1 Cost of Feasibility Study <br />1.2 Estimated Cost of Construction <br />1.3 Construction Contingency <br />1.4 Estimated Cost of Engineering and <br />Construction Management <br />1.5 Project Price Increase <br />1.6 Interest During Project Execution <br /> <br />2.0 Fund Requirement Schedule <br />3.0 Operation, Maintenance, and Replacement <br />4.0 Emergency Operating Fund <br />5.0 Unit Costs Per Acre-Foot <br /> <br />CHAPTER VII: PROJECT EVALUATION <br /> <br />1.0 Payment Capacity <br />2.0 Alternative Sources of Supply <br />3.0 Additional Project Benefits <br /> <br />1152c <br />