My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00400
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:43 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br /> <br />TABLE OF CONTENTS <br />Page 3 <br /> <br />PAGE <br /> <br />5.0 Feasibility Design <br /> <br />73 <br /> <br />73 <br /> <br />73 <br />74 <br /> <br />74 <br />75 <br /> <br />75 <br /> <br />75 <br />79 <br />79 <br />80 <br />81 <br /> <br />81 <br /> <br />82 <br /> <br />82 <br /> <br />82 <br />84 <br />84 <br />84 <br /> <br />86 <br />86 <br /> <br />86 <br />87 <br />88 <br />88 <br /> <br />89 <br /> <br />89 <br />91 <br />92 <br /> <br />5.1 Design Criteria <br /> <br />5.1.1 Embankment Dam Stability Criteria <br />5.1.2 Embankment and Foundation Filter <br />and Drainage Criteria <br />5.1.3 Dutlet Works Design Criteria <br />5.1.4 Spillway Design Criteria <br /> <br />5.2 Feasibility Design Description <br /> <br />5.2.1 Embankment Dam and Foundation <br />5.2.2 Outlet Works <br />5.2.3 Service Spillway <br />5.2.4 Auxiliary Spillway and Dike <br />5.2.5 Chambers Lake Inlet Dike <br /> <br />5.3 Stability Analysis <br /> <br />CHAPTER VI: ESTIMATED COSTS <br /> <br />1.0 Summary of Project Costs <br /> <br />1.1 Cost of Feasibility Study <br />1.2 Estimated Cost of Construction <br />1.3 Construction Contingency <br />1.4 Estimated Cost of Engineering and <br />Construction Management <br />1.5 Project Price Increase <br />1.6 Interest During Project Execution <br /> <br />2.0 Fund Requirement Schedule <br />3.0 Operation, Maintenance, and Replacement <br />4.0 Emergency Operating Fund <br />5.0 Unit Costs Per Acre-Foot <br /> <br />CHAPTER VII: PROJECT EVALUATION <br /> <br />1.0 Payment Capacity <br />2.0 Alternative Sources of Supply <br />3.0 Additional Project Benefits <br /> <br />1152c <br />
The URL can be used to link to this page
Your browser does not support the video tag.