My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00400
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:43 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />=============================================================================== <br /> <br />TABLE IV.3 <br /> <br />Average Monthly Demand Pattern for the Period 1982-1986 <br /> <br />Month <br /> <br />Percent of Annual Demand <br /> <br />January <br />February <br />March <br />April <br />May <br />June <br />July <br />August <br />September <br />October <br />November <br />December <br /> <br />5 <br />5 <br />5 <br />8 <br />10 <br />12 <br />15 <br />14 <br />10 <br />6 <br />5 <br />5 <br /> <br />------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------- <br /> <br />The historical and projected maximum day demands within the City of Greeley <br />water servi ce area are shown on Table IV. 4 for the peri od from 1971 to 2015. <br />The table also displays the precipitation which occurred during the April 1 to <br />September 30 irrigation season. For the historical period, the maximum day <br />demand averaged 39.5 mgd, and the i rri gati on season preci pitati on averaged <br />9.91 inches. The 1986 maximum day use was 41.8 mgd, but the 1 argest daily <br />demand on record was the 47.4 mgd which occurred in 1980. <br /> <br />Maximum day demands are important because water treatment facilities are <br />designed based on their capacity to produce treated water. The projected <br />values from 1990 to 2015 were calculated by multiplying the projected average <br />annual daily demand by a peaki ng factor of 2.4. Thi s is the average peaki ng <br />factor over the last 16 years for the City of Greeley water system. The <br />maximum daily demand projected for the year 2015 is 83.0 mgd. <br /> <br />The peak hourly rates are important as the basi s for si zi ng di stributi on <br />works. Over the 1 ast fi ve years, the maximum hourly rate of consumpti on <br />ranged from a low of 65.9 mgd in 1985, to a hi gh of 77.9 mgd in 1984. The <br />average for the 1982 to 1986 period was 72.1 mgd, or about 380 percent of the <br />average daily consumption. <br /> <br />1231 H <br /> <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.