Laserfiche WebLink
<br />. <br /> <br />..: 4 - <br /> <br />(e) Water Utilization <br /> <br />. <br /> <br />(1) Prepare a list of alternative methods of utilizing <br />available water sources including new water rights, <br /> <br />wells, and Denver Water Department sources. Show <br /> <br />amount and source of water required under each of <br /> <br />following assumptions: <br /> <br />i) Distri~t sqpplies total water needs to all service areas. <br />Existing wells 'to be incorporated into District system. <br />No dependence,on supplies from Denver. <br /> <br />ii) District acquires water rights only for areas not under <br />contract with Denver. <br /> <br />Engineer <br />Typist <br /> <br />14 hours <br />4 hours <br /> <br />(2) Prepare summary of surface water, groundwater and Denver <br /> <br /> <br />water use on annual basis at present time, in 5 years <br /> <br /> <br />and at full development under the two alternate conditions <br /> <br /> <br />listed above in (1). <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />8 hours <br />12 hours <br />4 hours <br /> <br />(4) Analyze potential impact of agreement with Denver to <br /> <br /> <br />use return flow from snow making and sewer plan outfall. <br /> <br />Engineer <br />Typist <br /> <br />(f) Wa~er Quality <br /> <br />10 hours <br />4 hours <br /> <br />Prepare a brief discussion of the type of treatment required, <br /> <br /> <br />and test two samples of the raw water for physical and chemical <br /> <br /> <br />properties. <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />2 hour s <br />2 hours <br />2 hours <br /> <br />(5(a)2; 5(b)2; 5(e)3, 5(f)2, 5(f)4 and 5(f)5 not included <br />in this proposal). <br /> <br />6. Chapter V, "Plan of Development" <br /> <br />Prepare a general description of the physical plan, design <br />criteri~, and a preliminary design for diversion faciltities, <br />treatment plant, pumping, -storage, pressure regulators r and pipe- <br />lines, examining alternatives as appropriate. <br /> <br />Engineer 'lOC hours <br />Technician 60 hours <br />Typist 8 hours <br />(6(a)l, 6(a)3-6,6(b),6(c)3-8, 6(c)II-13, 6e, 6f not included <br />in this proposal). <br />