My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00398
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153038
Contractor Name
Winter Park Water and Sanitation District
Contract Type
Grant
Water District
0
County
Grand
Bill Number
Xb 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />..: 4 - <br /> <br />(e) Water Utilization <br /> <br />. <br /> <br />(1) Prepare a list of alternative methods of utilizing <br />available water sources including new water rights, <br /> <br />wells, and Denver Water Department sources. Show <br /> <br />amount and source of water required under each of <br /> <br />following assumptions: <br /> <br />i) Distri~t sqpplies total water needs to all service areas. <br />Existing wells 'to be incorporated into District system. <br />No dependence,on supplies from Denver. <br /> <br />ii) District acquires water rights only for areas not under <br />contract with Denver. <br /> <br />Engineer <br />Typist <br /> <br />14 hours <br />4 hours <br /> <br />(2) Prepare summary of surface water, groundwater and Denver <br /> <br /> <br />water use on annual basis at present time, in 5 years <br /> <br /> <br />and at full development under the two alternate conditions <br /> <br /> <br />listed above in (1). <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />8 hours <br />12 hours <br />4 hours <br /> <br />(4) Analyze potential impact of agreement with Denver to <br /> <br /> <br />use return flow from snow making and sewer plan outfall. <br /> <br />Engineer <br />Typist <br /> <br />(f) Wa~er Quality <br /> <br />10 hours <br />4 hours <br /> <br />Prepare a brief discussion of the type of treatment required, <br /> <br /> <br />and test two samples of the raw water for physical and chemical <br /> <br /> <br />properties. <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />2 hour s <br />2 hours <br />2 hours <br /> <br />(5(a)2; 5(b)2; 5(e)3, 5(f)2, 5(f)4 and 5(f)5 not included <br />in this proposal). <br /> <br />6. Chapter V, "Plan of Development" <br /> <br />Prepare a general description of the physical plan, design <br />criteri~, and a preliminary design for diversion faciltities, <br />treatment plant, pumping, -storage, pressure regulators r and pipe- <br />lines, examining alternatives as appropriate. <br /> <br />Engineer 'lOC hours <br />Technician 60 hours <br />Typist 8 hours <br />(6(a)l, 6(a)3-6,6(b),6(c)3-8, 6(c)II-13, 6e, 6f not included <br />in this proposal). <br />
The URL can be used to link to this page
Your browser does not support the video tag.