My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00398
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153038
Contractor Name
Winter Park Water and Sanitation District
Contract Type
Grant
Water District
0
County
Grand
Bill Number
Xb 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />- 2 - <br /> <br />. <br /> <br />4. Chapter II _S_ "Lan~". <br /> <br /> <br />(4c,d). Prepare information regarding present and proposed land <br /> <br /> <br />use, general ownershlp of public and private land, papulation, <br /> <br /> <br />ski area attendance, and to-year growth projects; together with <br /> <br /> <br />appropriate exhibits. <br /> <br />.Engineer. <br />Techn~cian <br />Typist <br /> <br />10 hours <br />12 hours <br />8 hours <br /> <br />(4a and b not included in this proposal) <br /> <br />5. Chapt(-~r IV, "Water" <br /> <br />(a) Water Requirements <br /> <br /> <br />(1) Prepare estimates of existing and projected water use <br /> <br /> <br />parameters 'for peak hour, maximum day, and annual <br /> <br /> <br />diversions. Monthly diversions will be estimated for <br /> <br /> <br />the existing development, and for anticipated develop- <br /> <br /> <br />ment in approxiwately 10 years. Also, prepare <br /> <br /> <br />a .discussion of lawn irrigation requirements and <br /> <br /> <br />estimates of consumptive use by month. <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />24 hours <br />12 hours <br />8 hours <br /> <br />(3 - 5) Prepare an estimate of system losses such as <br /> <br /> <br />leakage, back-wash, and fire hydrant testing, and <br /> <br /> <br />combined water use and loss information for estimated <br /> <br /> <br />maximum day, annual diversions, and monthly diversions <br /> <br /> <br />for the existing development and anticipated develop- <br /> <br /> <br />ment in approximately 10 years. Information will <br /> <br /> <br />be separated as necessary by land areas and physical <br /> <br /> <br />system supply areas. <br /> <br />Engineer <br />Technician <br />ffypist <br /> <br />(b) Surface Water Supply <br /> <br />(1) Review stream flow data from U.S.G.S. gauges utilizing <br /> <br />12 hours <br />12 hours <br />4 hours <br /> <br />information as required from SEa and the Denver Water <br /> <br /> <br />Department. Prepare average year and dry year hydrographs. <br /> <br />Engineer <br />Technician <br /> <br />10 hours <br />20 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.