Laserfiche WebLink
<br />. <br /> <br />- 2 - <br /> <br />. <br /> <br />4. Chapter II _S_ "Lan~". <br /> <br /> <br />(4c,d). Prepare information regarding present and proposed land <br /> <br /> <br />use, general ownershlp of public and private land, papulation, <br /> <br /> <br />ski area attendance, and to-year growth projects; together with <br /> <br /> <br />appropriate exhibits. <br /> <br />.Engineer. <br />Techn~cian <br />Typist <br /> <br />10 hours <br />12 hours <br />8 hours <br /> <br />(4a and b not included in this proposal) <br /> <br />5. Chapt(-~r IV, "Water" <br /> <br />(a) Water Requirements <br /> <br /> <br />(1) Prepare estimates of existing and projected water use <br /> <br /> <br />parameters 'for peak hour, maximum day, and annual <br /> <br /> <br />diversions. Monthly diversions will be estimated for <br /> <br /> <br />the existing development, and for anticipated develop- <br /> <br /> <br />ment in approxiwately 10 years. Also, prepare <br /> <br /> <br />a .discussion of lawn irrigation requirements and <br /> <br /> <br />estimates of consumptive use by month. <br /> <br />Engineer <br />Technician <br />Typist <br /> <br />24 hours <br />12 hours <br />8 hours <br /> <br />(3 - 5) Prepare an estimate of system losses such as <br /> <br /> <br />leakage, back-wash, and fire hydrant testing, and <br /> <br /> <br />combined water use and loss information for estimated <br /> <br /> <br />maximum day, annual diversions, and monthly diversions <br /> <br /> <br />for the existing development and anticipated develop- <br /> <br /> <br />ment in approximately 10 years. Information will <br /> <br /> <br />be separated as necessary by land areas and physical <br /> <br /> <br />system supply areas. <br /> <br />Engineer <br />Technician <br />ffypist <br /> <br />(b) Surface Water Supply <br /> <br />(1) Review stream flow data from U.S.G.S. gauges utilizing <br /> <br />12 hours <br />12 hours <br />4 hours <br /> <br />information as required from SEa and the Denver Water <br /> <br /> <br />Department. Prepare average year and dry year hydrographs. <br /> <br />Engineer <br />Technician <br /> <br />10 hours <br />20 hours <br />