My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150094 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150094 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2011 3:14:09 PM
Creation date
10/5/2006 11:53:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150094
Contractor Name
La Plata Water Conservancy District
Contract Type
Grant
Water District
0
County
La Plata
Bill Number
HB02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />., <br /> <br />PROJECT SUMMARY - LA PLATA WCD - CONTRACT C150094 <br /> <br />SECTION 1 -CONTRACTOR INFORMATION <br />Contractor Name: La Plata Water Conservancy District <br />Address: 841 East 2nd Avenue <br />Durango, Colorado 81301 <br />Contact: Jim Isgar, President <br /> <br />Phone Number: 970-247-2659 Fax Number: 970-259-8423 <br /> <br />Section 2 - Project Description <br /> <br />Description of Project. The PROJECT will consist of a feasibility study that investigates <br />construction of a reservoir on Long Hollow. A reservoir at this site was determined to be <br />the best way to improve administration of the La Plata River in accordance with the <br />requirements of the La Plata River Compact. Enlargement of the Red Mesa Reservoir <br />is also proposed to provide added storage in the upper basin. The PROJECT also <br />includes actual design work. The CONTRACTOR will select the Engineering Consultant to <br />conduct the study. <br />SECTION 3 - TIME FOR PERFORMANCE <br />Project Beginning: Upon effective date of this contract <br /> <br />Project Finish: On or before June 30, 2005 <br /> <br />SECTION 4 - DISBURSEMENT SCHEDULE <br /> <br />Disbursement of funds, The CWCS shall disburse funds to the CONTRACTOR to pay for <br />the costs associated with the PROJECT up to a maximum amount of $445,000 in the <br />following manner: <br />a. Statement of costs. During the completion of the tasks, the CONTRACTOR shall <br />prepare statements of the costs of the PROJECT and submit said statements to the <br />CWCS for payment. Each statement shall indicate the tasks that have been <br />performed and the percentage completion of each task by task number as speCified <br />in the Scope of Work. <br />b. Payment of statements. Upon receipt and approval by the CWCB of each such <br />statement of costs, the CWCS will, within 30 days from the approval of such <br />statement, pay to the CONTRACTOR the amount of the statement or such portion <br />thereof as has been approved by the CWCS. <br /> <br />ApPENDIX 1 TO CONTRACT C150094 <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.