Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />CONTRACTOR: LA PLATA WATER CONSERVANCY DISTRICT <br />Contract No. C150094 <br />Contract Amount $445,000 <br /> <br />Agency Name: Water Conservation Board <br /> <br />~~~~~~ ~~~~~r PD~ PDA tYJf)! / <br /> <br />CONTRACT <br /> <br />, THIS CONTRACT, made this July 1 , 2002, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board, hereinafter referred to as the CWCB and/or STATE, and La Plata <br />Water Conservancy District, 841 East 2nd Avenue, Durango, Colorado 81301 hereinafter <br />referred to as the CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment as follows: Fund Number 424, Organization YYYY, Appropriation Code LHR, <br />GBL L094, Program WTRC, Object Code 5120, Contract Encumbrance No. C150094 <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and <br />with appropriate agencies. <br /> <br />3. CWCB's authority for making this nonreimbursable expenditure: Section 37-60- <br />121 (1)(b)(IV), C.R.S., authorizes the CWCS to make nonreimbursable expenditures <br />from the CWCB Construction Fund with specific authorization from the General <br />Assembly. <br /> <br />4. The Project Summary, attached as Appendix 1 and incorporated herein, contains <br />Contractor Information (Section 1) and Project Description (Section 2). <br /> <br />5. Board approval and legislative approval, if required <br /> <br />a. At its November 2001 meeting, the CWCB approved an amount up to $445,000 to <br />conduct a feasibility study to evaluate construction of the Long Hollow Reservoir, <br />enlargement of the Red Mesa Ward Reservoir, and any associated design work <br />(PROJECT). <br /> <br />b. Pursuant to Bill HB02-1152, Section 10, the Colorado General Assembly authorized <br />CWCB to allocate to the CONTRACTOR an amount up to $445,000 for the PROJECT or <br />so much thereof as may be necessary to refinance the PROJECT wholly or partially <br />completed. <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent covenants <br />contained herein, the parties agree as follows: <br /> <br />A. Performance of PROJECT. The CONTRACTOR shall perform the PROJECT in accordance <br />with the Scope of Services attached as Appendix 2 and incorporated herein <br /> <br />B. Time of performance. The CONTRACTOR recognizes that time is of the essence in the <br />performance of its obligations under this contract. Therefore, the CONTRACTOR shall be <br />responsible for the completion of the tasks listed in the PROJECT Scope of Services <br />within the time specified in Section 3 (Time of Performance) of the Project Summary. <br /> <br />C. Disbursement of funds. The CWCB shall disburse funds in accordance with <br /> <br />Page 1 of 4 <br />