My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00396
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:53:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153741
Contractor Name
Vouga Reservoir Association
Contract Type
Loan
Water District
72
County
Saguache
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />l <br />I, <br />I <br />I <br /> <br />The existing low-level outlet at Vouga Dam was found to be damaged beyond repair. As a <br />result of the low-level outlet condition, CDWR mandated an emergency action that no water be <br />stored behind Vouga Dam during 1995. Subsequently, Vouga Dam was permitted to be <br />breached and the low-level outlet removed. <br /> <br />1.2 FEASffiILITY STUDY OBJECTIVE <br /> <br />The main objective of this feasibility study for Vouga Dam is to evaluate the rehabilitation of <br />the dam by reconstructing the embankment (phase 1). <br /> <br />242J61R1.DOC 02-12-97(3:08PM)/RPT <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.