My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150093 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150093 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2015 1:15:16 PM
Creation date
10/5/2006 11:53:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150093
Contractor Name
Rio Grande Water Conservation District
Contract Type
Grant
Water District
0
County
Alamosa
Bill Number
HB02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.� <br />United States Department of the Interior <br />BUREAU OF RECLAMATION <br />Alamosa Field Division <br />10900 Hwy. 160 East <br />Alamosa, CO 81101-9518 <br />IN REPLY REFER TO: <br />AFD-400 <br />ACM-4.00 <br />Ralph Curtis, Manager <br />Rio Grande Water Conservation District <br />10900 Hwy 160 E. <br />Alamosa, CO 81101 <br />MAY 12 2004 <br />Subject: Time E�ctension for performance under contract C150093 between the <br />Colorado Water Conservation Board and the Rio Grande Water <br />Conservation District — Closed Basin, Alamosa, CO <br />Dear Ralph, <br />Based on the current status of drilling we anticipate we will utilize supplies and materials for <br />appro�mately ten wells this year. Because of our schedule of completing approximately ten <br />wells per year it is estimated that these funds will not be expended as of the project finish date of <br />"on or before June 30, 2004" With the assistance of the Rio Grande Water Conservation District <br />and the Crrant from the Colorado Water Conservation Board the Alamosa Field Division has <br />successfully re-drilled nineteen (19) salvage wells with the new well design. Production from <br />these wells is ranging from 200 to 500 gpm. These are positive steps in recovering salvage well <br />production. <br />We would request that based on our current schedule the project completion date be modified <br />and e�ended to June 2006. This will allow us to purchase the supplies for the project as needed <br />and not stock more than will be used. <br />Attached is the accountability of supplies purchased for this project. <br />Sincerely, <br />�..�i y�. �:�"�`�-- <br />Ella Mae Herrera, Manager <br />Alamosa Field Division <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.