My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00382
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2010 10:57:00 AM
Creation date
10/5/2006 11:52:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153685
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />..ff --S rIP ,;< <br /> <br /> WELL DATA <br /> Adjudicated Actual <br /> Year capacity capacity 1992 Actual <br />Well ~ Inst GPM GPM Formation Production <br />1 Tributary 1912 100 50 Dawson 4,946,761 <br />2* Tributary 1955 145 100 Dawson & 6,817,000 <br /> Denver <br />3 Tributary 1974 200 100 Dawson & 21,242,000 <br /> Denver <br />4&5 Tributary 1983 160 150 Monument 7,037,000 <br /> Creek <br /> Alluvium <br />6 Tributary 1983 27 20 Monument 2,371,000 <br /> Creek <br /> Alluvium <br />7** Non- 1992 340 340 Arapaho 11. 850.000 <br /> TOTAL 972 760 54,263,761 <br /> <br />NOTES: <br /> <br />* Well ceased operation on June 15, 1992 (760-100 = 660 current gpm) <br /> <br />** Started in July of 1992; inoperable all of December for repairs <br /> <br />Although relatively deep, Well Nos. 1,2,& 3 are considered tributary and can <br />be pumped for three days per week without the need for augmentation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.