Laserfiche WebLink
<br />Monument Lake Darn Feasibility Study <br /> <br />31 <br /> <br />130'r'LE.': <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter IV - Formulation of Alternatives <br /> <br />present dam location. The articulated mat will prevent soil erosion. Three vertical drops will be <br /> <br /> <br />constructed between the upstream and downstream natural stream inverts. The vertical drops <br /> <br />will maintain a stable channel by controlling the channel velocity. The upstream and <br /> <br />downstream limits of the channel will be protected by imported riprap. The site will be restored <br /> <br /> <br />with native seed. The Town determined that thi~ option was not a viable alternative and was not <br /> <br /> <br />developed any further. <br />