My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00380
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:52:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153336
Contractor Name
Hudson, Town of & Hudson Water Fund Entrprise
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />\ <br />I <br />i <br /> <br />-~, <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BDARO <br />CONSTRUCTION FUNO PROGRAM PROCEDURES <br /> <br />1. Board approval of engIneerIng firm and engineerIng <br />agreement between engIneering firm and project sponsor., <br /> <br />',' <br /> <br />2. <br /> <br />Prepdr~tlon of detaIled plans and specifications for <br />authorIzed projects by consulting engineerIng firm. <br /> <br />3. Approval of detailed plans and specificatIons by Board <br />staff (plans and specifications for storage. dd~S and <br />reservoIrs must also be approved by State Engineer's <br />offIce). <br /> <br />4. <br /> <br />Board staff approval of bidding for the project. Board <br />staff present at bid opening for constructIon. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notIce to proceed wIth construction to the contractor <br />(both notIces must be approved by the Board staff before <br />they are Issued). <br /> <br />6. Conduct a pre-constructIon conference. Approval of <br />constructIon schedule by Board staff. <br /> <br />7. <br /> <br />ConstructIon Commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before dny <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br /> <br />, <br /> <br />8. The consulting engineer certifIes that the project has <br />been compieted according to approved drawings and <br />specifications and arr~~ges for fiR~l inspection. <br /> <br />9. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />10. Submittal of as-buIlt drawIngs to Board staff for <br />approval and fILIng. <br /> <br />, , <br />
The URL can be used to link to this page
Your browser does not support the video tag.