Laserfiche WebLink
<br />SCHEOULP. A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURF.S <br /> <br />1. Preparation of detailed plans and specifications for <br />authorized projects by the Soil Conservation Service. <br /> <br />2. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />off ice) . <br /> <br />3. Conduct a pre-construction conference. <br /> <br />4. Construction commences. The Board staff makes periodic <br />inspections during construction. <br /> <br />5. The Soil Conservation Service certifies that the project <br />has been completed according to approved drawings and <br />specifications and arranges for final inspection. <br /> <br />6. Final inspection and acceptance of as-built project by <br />Board staff. <br /> <br />7. Submittal of as-built drawings to Board staff for <br />approval and filing. <br /> <br />PAID <br /> <br />102 <br />sched/a <br />