My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153804 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153804 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 3:26:42 PM
Creation date
10/5/2006 11:51:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153804
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Certification <br /> <br />I, Mark A. McLean, a registered professional engineer in the State of Colorado, hereby <br />certify that the information presented in this report was prepared by me or was prepared under <br />my direct supervision for the owners thereof. <br /> <br />By: <br /> <br />Mark A. McLean, P.E., #25061 <br /> <br />Acknowledgments <br /> <br />Rocky Mountain Consultants, Inc. would like to thank the Board and staff of the Left <br />Hand Ditch Company for their valuable assistance during the preparation of this report. Special <br />thanks to Mr. Richard Behrmann, President and Ms. Sarah Rodriguez, office secretary, for their <br />time and efforts on this project. We would also like to thank Mr. John Van Sciver and Mr. Bill <br />Green of the Colorado Water Conservation Board for their help in understanding the <br />requirements of this submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.