Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-, <br /> <br />E. Water Quality <br /> <br /> <br />There will be no water quality impacts as a result of this project, nor will there be any new <br /> <br /> <br />water supplies developed as a part of this project for which water quality would need to be <br /> <br /> <br />addressed. Construction dewatering will be performed in accordance with all appropriate permits. <br /> <br />F. Field Investigations <br />Field investigations to date include site inspections by the author, topographic surveys of the <br />north dam, its environs, and the south dam crest, and a geotechnical investigation of the north dam. <br />A copy of the topographic map prepared from the survey is included as Figure III-2. A copy of the <br />Preliminary Geotechnical Studies report (Rocky Mountain Consultants, Inc., 1994) is included as <br />Appendix E. The topographic survey and geotechnical investigation were conducted in order to <br />provide a basis for design of the spillway improvements. Photographs of the Left Hand Valley <br />Reservoir area are included in Appendix F. <br /> <br />12 <br />