My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150065 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150065 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:14:12 PM
Creation date
10/5/2006 11:51:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150065
Contractor Name
Tunnel Water Company, The
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 01-157
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />BORROWER: TUNNEL WATER COMPANY <br />Contract No. C150065 <br />Loan Amount $2,080,000 <br /> <br />Agency Name: Water Conservation Board <br />Age~cy Number PDQ.=;z fJ.A1/1..1..,.. ~ <br />Routing Number_ , ~ <br /> <br />LOAN <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 11lh day of July 2001, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado Water <br />Conservation Board ("CWCB" and/or the "STATE"}, and The Tunnel Water Company, P.O. <br />Box 1584, Fort Collins, CO 80522, a Colorado non-profit corporation, ("BORROWER" and/or <br />"CONTRACTOR"). <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br />made available and a sufficient unencumbered balance thereof remains available for <br />payment as follows: Fund Number 424, Organization yyyy, Appropriation Code L01, <br />GBL TUNN, Program WTRC, Object Code 5881, Reporting Category 0065, Contract <br />Encumbrance No. C150065 <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. <br /> <br />3. CWCB's authority for making this loan: Pursuant to the provisions of SS 37-60-119 and <br />37-60-120, C.R.S. the CWCB is authorized to loan money for the construction of water <br />projects for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. <br /> <br />4. The Project Summary, attached as Appendix 1 and incorporated herein, contains . <br />BORROWER Information (Section 1) and the PROJECT Description (Section 2). <br /> <br />5. Board approval and legislative authorization, if required <br /> <br />a. At its January 2001 meeting, the CWCB approved a loan to the BORROWER in an <br />amount up to $2,080,000, not to exceed 90% of the cost of the PROJECT, at an interest <br />rate of 4.3% per annum for a repayment term of 30 years. <br /> <br />b. Pursuant to Senate Bill 01-157, Section 1(1)(c), the Colorado General Assembly <br />authorized CWCB to loan to the BORROWER an amount up to $2,080,000 ("LOAN <br />AMOUNT") for the PROJECT. <br /> <br />THEREFORE, in consideration of the mutual and dependent covenants contained herein, <br />the parties agree as follows: <br /> <br />A. LOAN PROVISIONS <br /> <br />1. Promissory Note Provisions. The CWCB agrees to loan to the BORROWER an amount <br />not to exceed the LOAN AMOUNT and the BORROWER agrees to repay the loan in <br />accordance with the terms as set forth in the Promissory Note, attached hereto as <br />Appendix 2 and incorporated herein. <br /> <br />2. Interest Prior to Project Completion. As the loan funds are disbursed by the CWCB to <br />the BORROWER, interest shall accrue at the rate set by the CWCB for this loan. The <br /> <br />Tunnel Water Company <br /> <br />Page 1 of 11 <br /> <br />Loan Contract <br /> <br />COF" d <br />
The URL can be used to link to this page
Your browser does not support the video tag.