Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> <br />CONTRACTOR: <br />Corporation <br /> <br />Boyle Engineering State of Colorado <br />Bill Owens, Governor <br /> <br />By <br />Blaine <br /> <br /> <br />BY~~ <br /> <br />For the Executive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Rod Kuharich, Director <br /> <br />FederallD Number: 95-1735889 <br /> <br />" (S EAL) <br /> <br /> <br />, I <br />I \),. <br />'J Attest..I, <br />} (,) I) . <br /> <br />""..h~~ <br />>.", By' A;/~. ~L.C '- <br /> <br />Daniel McElwaine, Ad inistrative Manger <br /> <br />By -f?i1lJ ~- <br /> <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods <br />and/or services provided. <br /> <br />Arthur L. Barnhart, State Controller <br /> <br />~kh-P (k~u~ <br /> <br />Effe ive Date \0 ~( 0 1, <br /> <br />Revised: 12/1/01 <br /> <br />Page 6 <br />