My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150141 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150141 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150141
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Bill Number
SB03-110 Section 15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. Financial feasibility defined as the ability of sponsoring entities to finance and <br />pay all costs associated with the project or action, and <br /> <br />. The degree of uncertainty associated with each configuration. <br /> <br />Sb. Conduct a "fatal flaw" analysis. <br /> <br />Sc. Conduct a second evaluation process to narrow the range of configurations. <br /> <br />8d. With input from the Technical Committee, the CWCB staff, and the DNR staff, the <br />CWCB will select one or more preferred configurations or recommend the project as not' <br />feasible. <br /> <br />Task 9 - Documentation and Justification of Selected Confil!urations <br /> <br />Justify the selection of the preferred project configurations as it compares to other major water <br />development alternatives. Document the advantages and disadvantages of the preferred <br />configurations over the other major water development alternatives with regard to incremental <br />cost differences and benefits. <br /> <br />9a. Compare the costs and benefits of the p'referred project configuration to other major <br />water development alternatives to the extent that similar cost and benefit information is <br />readily available for these other major projects. <br /> <br />9b. Document input used in the analysis of the .alternatives. <br /> <br />Task 10 - Proiect Develovment Stratel!ies <br /> <br />Determine preliminary project development strategies for the implementation of the preferred <br />configurations. <br /> <br />The strategies will include readily available input from prospective project users, measures that <br />could be taken on a local, regional or state-wide basis such as new or revised institutional <br />arrangements, statutory revisions, policy changes of various agencies or organizations, and new <br />or revised water project funding methods. <br /> <br />The Technical Committee and the CWCB will review the project development alternatives. <br />Included in this task will be recommendations for any further analyses or studies that may be <br />needed to provide more detailed information on particular actions or projects. <br /> <br />lOa. Formulate project development strategies for implementation of the preferred <br />configurations including readily available input from prospective project users. <br /> <br />lOb. Identify tradeoffs and uncertainties involved in each strategy. <br /> <br />IOc. Review project development strategies with the Technical Committee and the <br />CWCB. <br /> <br />10d. Recommend any further analyses or studies that may be needed. <br />10e. Prepare study conclusions. <br /> <br />Page II of 12 <br /> <br />Contract SCOPE 5-1-03 BND <br />
The URL can be used to link to this page
Your browser does not support the video tag.