Laserfiche WebLink
<br />/~t:'l <br />) <br /> <br />-2- <br /> <br />The above total does not include additional anticipated <br />billing from Bruns, Inc. for continuing engineering services. <br />Neither do the above figures include other administrative <br />expenses already incurred and to be incurred in the future <br />by the Farmers Irrigating Ditch and Reservoir Company as a <br />direct result of the 1980 Big Thompson Flood. Still, the <br />above itemized expenses substantially exceed the sum of <br />$235,000.00 upon which the loan from the Colorado Water <br />Conservation Bord in the amount of $63,000.00 was based. <br /> <br />I hope that the above will be sufficient for your purposes <br />toward the pursuit of final consummation of the loan in the <br />amount of $63,000.00. <br /> <br />According to documents filed on January 27, 1981, the <br />contractors project completion of the project during the <br />month of February, 1981. As a consequence, we would most <br />appreciate the disbursement of the total sum of $109,000.00 <br />as proceeds from the emergency loan acquired through the Colorado <br />Water Conservation Board. <br /> <br />Thank you for your past and continued aid in the above <br />matters. <br /> <br />Very truly yours, <br /> <br />DeGood and Kaufman <br />-,) .' <br />_-. j')CL . ;. I . <br />BY: 'hC' 'I / l \ ( <br />F. Ray DeGood <br /> <br />(j~< <'CC- <br />./5 <br />" <br /> <br />FRD/jg <br />