My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00372
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 3:10:25 PM
Creation date
10/5/2006 11:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
OEP1
Contractor Name
Farmers Irrigating Ditch and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
EO 05-30-80
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />, <br /> <br />system owned by the Contractor which repair, replacement or reconstruc~ion, <br />which includes the work items and materials described on the letter <br />Report attached hereto ~s Appendix "An, is estimated to cost approximatelY, <br />~ R'lnn"e..d_'r..b.ir.t.~::.E.iJle_~.b.oJ.l..s.ao.d.... On11:=t r ~ ($? 111 non) _____________________ <br />and <br /> <br />WHEREAS, the State, through the Colorado water Conserv~rion Boardl <br />has agreed to repair, replace or reconstruct the said project and to sell <br />the same to the Contractor upon mutua~ly agreeable terms and conditions; <br />and <br /> <br />WSEREAS, pursu5nt to policy established by tne colorado Water Conser- <br />'v~tion Board and trom funds appropriated by the"General Assembly, the State <br />will e~pend the sum of Q~~_B~E~~~SL~jE~_~~2~~_~_~_D~~L~~~_LtL~~~~~L______ <br />tor thft repair, repl~c.ment and reconstruction of <br />the-projecti-and------- <br /> <br />KHEREAS, the contrActor has 4vailable from its own sources sufficient <br />funds to repair, replace or reconstruct the remainder of the project. <br /> <br />NOW THERBFORE, in consideration of the mutual and dependent covenants <br />herein contained, it. is hereby agreed by the parties hereto as follows; <br /> <br />A. The Contractor agrees that it will; <br /> <br />1. Cause said p,oject to be constructed within. one year of the date <br />of this contract in accordanc~ with project plans and specifications <br />approved by the Stato and any necessary modification hereof prepared by <br />it and also approved by the State, or unless such tlme is extended by the <br />State, or unless suc~ time is ins~fficient beca~se of the acts of God or <br />other acts or failure to act beyond the control of the Contractor. <br /> <br />2. Convey to the Colorado Water Conservation Board, Department of <br />Natural Resources, seate of Colorado, by approptiate deed or conveyance <br />an undivided one-halt interest to facilities to be repaired, replaced <br />or reconstructed in the Dj~~~~J~~~J_~JUL~~~~_L~~~_~t_~a~ai___________. <br />together with land and rights of the said facilities, all located in <br />T.~rim~~_C~~nk~____~--___________~_________, s~ate of, Colorado. <br /> <br />3. Permit periodic inspection of construction by the authorized rep- <br />resentatives of tha state during construction and permit the State to <br />review and approve or disapprove any contract far the construction of the <br />project or the performance of work pursuant to such contracts or sub- <br />contracts, except 'that this provision shall not apply to work heretofore <br />accomplished by the contractor. <br /> <br />4. Without expense to the State, manage, operate and maintain the <br />project .ystem continuously and in an efficient and economical manner, <br />and ass~me all legal and financial liability for such management, opera- <br />tion and maintenance. <br /> <br />5. Make the services of such project available within its capacity <br />to all stockholders of th. Contractor without discrim~liQtion BS to race, <br />color, religion, or natural origin at reasonable charges, including <br />assessments, taxes, or fees in accordance with a schedule of such charges, <br />whether for one or more classes of service, as may be formally adopted by <br />the Contractor through its board of directors, and as may be modifi~d from <br />time to time by the contractor. The ~nitial rate schedule must be approved <br />by the State. Thereafter, the Contraqtor may make such modifications to <br />the rate schedule as the Contracto~ d~ems necessary to effiCiently and <br />economically provide for the financial requirements of the system as long <br />as the rate schedule remains reasonable-and non-discriminatory and subject <br />to the approval by the State. <br /> <br />6. Adjust its operating costs and service charges from time to time <br />to provide for adequate operation and maintenance, emergency repair <br />.services, obsolescence reserves, debt service, and debt reserves. <br /> <br />7. Provide the state with such periodic reports as it may require <br />and permit periOdic inspections of its operation and accounts by a desig- <br />nated representative of the State. The Colorado Water Conservation Board, <br /> <br />Page 1__ of _~_ pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.