Laserfiche WebLink
<br />The Greeley and Loveland Irrigation Co. <br /> <br />808 TWENTY-THIRD AVE. <br /> <br />PHONE 352-0495 <br /> <br />e""' MER E. STROH, PRES_. GREEl.EY, COLO. <br />."ALO F. BRINKMAN, SECY., GREELEY, COLO. <br /> <br />May 3, 1988 <br /> <br />GREELEY, COlORADO <br />80631 <br /> <br />COlorado Water Conservation Board <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Re: Feasibility Study for the Rehabilitation of the <br />South Outlet Tunnel, Lake Loveland, Loveland, <br />Colorado <br /> <br />Dear Sir: <br /> <br />.' <br /> <br />The Greeley and Loveland Irrigation Company is herewith <br />transmitting the feasilibity study for the rehabilitation of the <br />south outlet tunnel, Lake Loveland, Loveland, Colorado. This <br />study was funded by the Greeley and Loveland Irrigation Company. <br />The feasibility study was done as a part of the Greeley and <br />Loveland Irrigation Company's application to the Colorado Water <br />Conservation Board to obtain financing for one-half (1/2) the <br />cost for Phase I rehabilitation of the south outlet tunnel, Lake <br />Loveland, Loveland, Colorado. The attached report has been pre- <br />pared in accordance with the Colorado Water Conservation Board <br />requirements governing the content and format of the feasibility <br />reports. <br /> <br />The south outlet tunnel rehabilitation will create no bene- <br />fit, impact or damages on the fish and wildlife, or recreation, <br />because there will be no change in historical amounts of water <br />stored or in the use of the reservoir of the Greeley and Loveland <br />Irrigation company system. Therefore, a letter or review by the <br />Division of wildlife or the Division of Parks and Recreation was <br />not deemed necessary and was not solicited, <br /> <br />With the submittal of this study, the Greeley and Loveland <br />Irrigation Company formally request funding from the Colorado <br />Water Conservation Board Construction Fund to finance approximately <br />one-half (1/2) of the project cost for the rehabilitation of the <br />south outlet tunnel, Lake Loveland, Loveland, Colorado, Your con- <br />sideration and approval of the funding will be greatly appreciated, <br /> <br />Respectfully, <br /> <br />GREELEY AND LOVELAND IRRIGATION COMPANY <br /> <br />(~~~/L <br /> <br />H-o~ ~ S g 7 _Lfl{ :5 '2. <br /> <br />e) <br /> <br />Elmer Stroh, President <br /> <br />ES/gc <br />Enclosures <br />