My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00371
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0021X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER IV <br /> <br />WATER <br /> <br />A. Water Requirements - See Operational Studies of the <br />Wheeler Report, Pages 30-80 of Exhibit "H". <br /> <br />B. Surface Water Supply - See Operational Sutdies of the <br />Wheeler Report, System Losses and Maintenance of Historical Return <br />Flows, Pages 30-90 of Exhibit "H". <br /> <br />C. Ground-Water Supply - Not applicable. <br /> <br />D. Water Rights - See Water Rights of the Wheeler Report, <br />Pages 8-20 of Exhibit "H". <br /> <br />E, Water Utilization - See Operational Studies of the <br />Wheeler Report, Pages 30-80 of Exhibit "H". <br /> <br />F. Water Quality - The proposed outlet tunnel rehabilitation <br />is a relining of an existing facility, No chemical or physical <br />water quality degradation is anticipated or proposed, No changes <br />will occur regarding sedimentation, diversion works, selective <br />withdrawal, or in the transport system. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.