Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE A-4. Estimated Additional Project Cost <br />For Four (4) 350 MW Units <br /> <br />ITEMS <br /> <br />Stripping dam foundation and structure <br />sites <br /> <br />Common excavation <br /> <br />Rock excavation <br /> <br />Furnishing, placing and compacting dam <br />embankment <br /> <br />Furnishing, placing and compacing filter <br />blanket and finger drains <br /> <br />Furnishing and Placing riprap for slope <br />protection <br /> <br />Concrete in spillway chute and stilling <br />basin <br /> <br />Furnishing and installing 10" diameter <br />concrete outlet pipe <br /> <br />Land acquisition <br /> <br />Miscellaneous hand labor <br /> <br />Direct Field Cost <br /> <br />Indirect Field Cost <br /> <br />Total Field Cost <br />Sales Tax, 5% <br />Contingency, +10% <br /> <br />Sub-Total <br />Fee +10% including Engineering & Profit <br /> <br />TOTAL Additional Project Cost <br /> <br />QUANTITY ~ fQg <br />4,950 CY 4,190 <br />1,940 CY 1,650 <br />1,230 CY 2,460 <br />242,000 CY 278,300 <br />1,070 CY 2,940 <br />4,930 CY 41,910 <br />152 CY 17 ,660 <br />55 Lin. Ft. 180 <br />640 Acres 115,200 <br />Lump Sum Job 1,800 <br /> $466,290 <br /> 6,300 <br /> $472,590 <br /> 190 <br /> 47,260 <br /> $520,040 <br /> 52,060 <br /> $572,100 <br />