My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00370
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0031X
Contractor Name
Yampa Project DNR 1972
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />operating, repairing and maintaining E1khead Creek Reservoir. <br />First Par~y shall be the sole owner of the dam and all faci- <br /> <br />1ities used in connection with the construction, operation, <br /> <br />maintenance and repair of said Reservoir. First Party shall <br />be entitled to any revenue received from fees or licenses in <br />connection with the operation of said Reservoir. Nothing <br />herein contained shall be deemed to create a partnership, a <br />joint venture, or joint ownership of any sort between the <br />Parties hereto. First Party shall indemnify and hold Second <br /> <br />Parties harmless from any claim, charge, cost, expense, dam- <br />age, or injury arising out of or resulting from the construc- <br /> <br />tion, operation, maintenance and repair of said Reservoir. <br /> <br />8. BOND FOR CONSTRUCTION CONTRACTS: <br />8.1 Each contract for the construction of facilities entered into <br /> <br /> <br />by First Party and third parties shall require a bond secur- <br /> <br /> <br />ing the performance of such contract executed by a Qualified <br /> <br /> <br />corporate surety in the total amount of the contract cost and <br /> <br />shall be substantially in the form of Exhibit 0, attached <br /> <br /> <br />hereto and by this reference made a part hereof. <br /> <br />9. REFUrm OF COSTS: <br /> <br />9.1 If the total cost of the E1khead Creek Reservoir. is less <br /> <br />than $ <br /> <br />, First Party agrees to refund the prorata <br /> <br />share of the difference between the estimated cost of the <br /> <br />Reservoir and the actual cost of said Reservoir. to Second <br />Parties within thirty days after completion of construction <br />in the following percentages: <br />Colorado-Ute Electric <br />Association, Inc. <br /> <br />29% <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.